by Mark Purvis | Jan 22, 2017 | Cheminova Manufacturing, Projects
Client: Cheminova Manufacturing Project: Concrete Remediation Cheminova Plant Location: Wyong NSW Scope: Repair moving slab by removing existing slab, exposing subgrade, and replacing with a new infill concrete slab. Repair concrete tank: polyurethane crack injection...
by Mark Purvis | Jan 18, 2017 | Projects, Storm and Wastewater Infrastructure, The Tasman Tank co., Water Storage
Client: The Tasman Tank Co. Project: Veolia Water Storage Tanks Location: Bingara Gorge NSW Scope: Sikadur-Combiflex SG System (High Performance Joint & Crack Waterproofing System to 2x water storage tanks.
by Mark Purvis | Jan 18, 2017 | Projects, Storm and Wastewater Infrastructure, The Tasman Tank co., Water Storage
Client: The Tasman Tank Co. Project: Hezeldenes Chickens, Veolia Water Storage Tanks Location: Bendigo NSW Scope: Sikadur-Combiflex SG System (High Performance Joint & Crack Waterproofing System to 2x water storage tanks
by Mark Purvis | Jan 18, 2017 | Projects, Storm and Wastewater Infrastructure, The Tasman Tank co., Waste Water Treatment
Client: The Tasman Tank Co. Project: Malabar Waste Water Treatment Plant PARR Renewals Upgrade – sludge tank Location: Malabar NSW Scope: Sikadur-Combiflex SG System (High Performance Joint & Crack Waterproofing System to sludge...
by Mark Purvis | Jan 17, 2017 | Insights
Many of Australia’s bridges, sewage and water systems, and other infrastructure are reaching the end of their serviceable lives and the choice for government is whether to replace or extend their lives. It has been reported that this applies to over 600 bridges in New...