by Ken Penfold | Jun 23, 2017 | Projects, Sewerage Infrastructure, Water Storage
FCS Concrete Repairs have been engaged by the Gosford Council to rehabilitate two large manholes in the Gosford area. FCS Concrete Repairs is experienced and fully resourced to carryout rehabilitation works for Water and Sewerage Infrastructure in confined spaces. The...
by Ken Penfold | Apr 4, 2017 | Post, Projects
[vc_row][vc_column][vc_custom_heading text=”PROCESS: INSTALLATION OF CARBON FIBRE REINFORCED POLYMER STRENGTHENING (CFRP) TO REINFORCED CONCRETE SOFFIT” font_container=”tag:h2|text_align:left|color:rgba(10%2C10%2C10%2C0.66)”...
by Ken Penfold | Apr 4, 2017 | Post, Projects
PROCESS: EPOXY CRACK INJECTION FCS Concrete Repairs successfully tendered to repair the concrete base slab in a water tank at the Bingara Gorge. Our client advised FCS Concrete Repairs that there was considerable fine cracking and repairs were necessary to prevent...
by Ken Penfold | Mar 14, 2017 | Concrete Repair, Concrete Topping, Joint Sealing, Leak Sealing, Projects, Protective Coating, Swimming Pool
Client: MDF Group Project: Hastings Pde North Bondi Location: North Bondi NSW Scope: Grind and apply SikaDur and Combiflex
by Ken Penfold | Mar 14, 2017 | Ausgrid Zone, Concrete Repair, Concrete Topping, Projects, Protective Coating
Client: MDF Group Project: Ausgrid Zone Substation Location: Bass Hill NSW Scope: Concrete topping and repairs
by Ken Penfold | Mar 14, 2017 | Concrete Repairs, Projects, Protective Coating
Client: Solander Towers Project: Solander Towers Location: Cronulla NSW Scope: Concrete driveway repairs