by Ken Penfold | Jan 26, 2017 | 4Malabar Alliance, Abrasive Blasting, Concrete Repair, Projects, Sewerage Infrastructure
Client: 4Malabar Alliance Project: Waste Water Treatment Plant Digester Location: Malabar NSW Scope: Repair and refurbishment of Sewage Digester 2 Tank
by Ken Penfold | Jan 26, 2017 | 4Malabar Alliance, Concrete Repair, Leak Sealing, Projects, Sewerage Infrastructure
Client: 4Malabar Alliance Project: Waste Water Treatment Plant Screen Channels Location: Malabar NSW Scope: Concrete Repair and Sealing to 5 Sewage Screen Channels
by Ken Penfold | Jan 22, 2017 | Crack Injection, Epoxy Coating, Projects, Sewerage Infrastructure, UGL
Client: UGL Project: Quakers Hill Sewage Treatment Plant Location: Quakers Hill NSW Scope: Crack Injection & Epoxy Coating to Concrete Sump with HDPE
by Ken Penfold | Jan 22, 2017 | Cheminova Manufacturing, Projects
Client: Cheminova Manufacturing Project: Concrete Remediation Cheminova Plant Location: Wyong NSW Scope: Repair moving slab by removing existing slab, exposing subgrade, and replacing with a new infill concrete slab. Repair concrete tank: polyurethane crack injection...
by Ken Penfold | Jan 18, 2017 | Projects, Storm and Wastewater Infrastructure, The Tasman Tank co., Water Storage
Client: The Tasman Tank Co. Project: Veolia Water Storage Tanks Location: Bingara Gorge NSW Scope: Sikadur-Combiflex SG System (High Performance Joint & Crack Waterproofing System to 2x water storage tanks.